Interregional Center for Economic Co-operation
A multi-purpose business center with exhibition halls and developed
infrastructure

The purpose of the project :
The main purpose of the project is to create in Khabarovsk, the main city of the Far Eastern Fedearal Okrug of Russia, a comfortable base to develop favourable conditions for economic, scientific, cultural, social co-operation with partners in
Pacific Asia.

Center’s main
functions and trends of work :
• Arranging universal and specialized, topical, branch-wise exhibitions of international, inter-regional and local levels;
• Organizing and conducting of symposiums, conferences,
workshops, presentations, round tables for businessmen in various
industries, talks and negotiations of international, inter-regional and local value;
• Providing with information, telecommunication, insurance and
legal services;
• Mediatorial service in searching business partners, provision with protocol and business contacts accompanied ceremonial functions;
• Granting on lease room-offices for local administrations representatives, enterprises, organizations and providing all-round supply for their functioning;
• Extra service on-demand (transportation, dwelling, cultural and entertainment programs etc.).

Project participants :
1. Initiators of the project:
- Russian Federation Subject - Khabarovsk krai Municipal formation - the city of Khabarovsk
- "Khabarovsk International Fair" Public Corporation (stock 100% are in possession of Khabarovsk krai Administration)
2. Requisition of design estimates: "Khabarovsk International Fair" Public Corporation
3. Requisition of construction, recipient of bank loans and person in charge:
"Interregional Center of Economic Cooperation" Public Corporation organized
on the 4-th of February 2005, whose shareholders are the subject of Russian Federation - Khabarovsk krai in the person of the Khabarovsk krai Property Relations Ministry (51% of stock) and a Municipal formation - the city of Khabarovsk in the person of the Municipal Property Department (49% of stock).
The Public Corporation's executive coordinator is General Manager Valeriy Arkadievich Cherepanov, who is a professional architect experienced in designing and construction of a number of advanced complexity objects in Khabarovsk. He is also an author and
chief advisor of the "ICEC" project.
The place of the construction site :
Khabarovsk city central planning zone, the place of the crossing arterial roads in South-North and West-East directions, the area of the site has 28.900 m2 (2.8 hectares), the site is free from constructions (from buildings)
The construction object :
A building with figures run-down of the construction items as
shown on the table :
| BUILDING |
Underground part |
Overground part |
TOTAL |
Dimensions
(m) |
108 õ 54 õ 3.6(h) |
108 õ 54 õ 19.5(h) |
|
Total area
(m2) |
6 350 |
17 365 |
23 715 |
Construction volume
(m2) |
20 948 |
104 847 |
126 796 |
Building inner space consists of two parts :
- three-story and six-story which contain:
-
Car parking for 67 automobiles
-
Emporium (1455 m2)
-
Two multi-purpose exhibition halls (2698 m2
õ 2 = 5396 m2)
-
Conference hall (341 m2)
-
Entrance hall, lobby, fore-halls (2832 m2)
-
Rooms offered for rent (2077 m2)
-
Other rooms for technological maintenance of the Center functioning
-
Passenger lifts, escalators and freight elevators
-
Small area on the adjoining territory for arranging open-air expositions (1800
m2) and a car parking for 370 automobiles
The building designed with a bearing metal frame, outside walls from self-bearing bonding sandwich-type boards with non-inflammable mineral heat
insulation. External coating is made from metal-plastic panels “Alucobond” and toning polished glass.
The design work stages and the availability ratio on the 30-th of June 2006 :
-
Preparation of the technical documents for granting ground area - 100%
-
Working out the technical specifications to hookup with engineering communications of the city - 100%
-
Elaboration of the technical documents for construction
works.
According with Russian regulations the designing of advanced complexity objects should be fulfilled in two stages:
The first stage “The Project” includes elaborating documentation for all parts of the construction (including general layout, transportation, engineering process,
power supply, electric equipment, communication and warning facilities, architecture-planning solutions, building structures and substructures, water supply and
sewage, conditioning, constructing organization, protection of
natural environment, engineering and topographic works,
calculation of the entire construction budget).
The documentation of “The Project” stage are to be negotiated with State supervision services and sanctioned by the State Expert Commission. It must be studied by a general contractor and specialized subcontractors. On the 30-th of June 2006 it has 100% of fulfillment.
The second stage “Working documentation” specifies eventual overpatching after experts' remarks, elaborating working drawings and full specifications of materials and equipment.
Working documentation, as a rule, is executed by projecting departments of specialized subcontractors which will do erection and installation
works.
On the 30-th of June 2006 “Working documentation” are fulfilled in parts needful to begin construction works in August 2006.
Cross-sectional
drafts of the project
Construction planned cost: 692 648 000 rubles ($27.777.000 - in keeping with the rate of exchange on 2006 June 30 to be equal
of the sum in rubles,
all dollars figures given below are calculated at that rate)
Construction estimated time is 24 months. The cost of all design
work is $750.000 and taken into total account of the construction.
Main incomes planned to be gained from the activity of the Center in a year:
(See the table below). Projected net profit is 25-30%.
| # |
Arrangements during a year |
USD
|
| 1 |
Organization of exhibitions and trade-show
(renting booths and exhibition space is 28800 m2
[1 m2 costs $90] ) |
2 592 000 |
| 2 |
Renting commercial pavilions in the emporium
(pavilions square is 500 m2) |
273 000 |
| 3 |
Renting office rooms (offices square is 2077
m2) |
1 137 000 |
| 4 |
Renting parking places in the underground
parking (the number of places is 67) |
320 000 |
| 5 |
Selling entrance tickets |
103 000 |
|
Total in a year: |
4 425 000 |
In calculating planned profit we have not taken
stock of additional income from using rooms for arranging
symposiums, conferences, cultural, spectacular and other shows.
Financial sources for investment expenses: Financing
of the project is planned to be done by means of attracting bank
loans.